A well-prepared base, an agreed layout and the selected tile system’s instructions are the starting point for installation. This guide covers project planning and checks; use the product-specific manual for actual installation dimensions, clearances and methods.
Survey the site before ordering
Measure the flooring area and record entrances, fixed equipment, drains, level changes and transitions to other surfaces. Take photographs from several corners and prepare a layout showing the playing lines, color zones and perimeter.
Have a qualified local contractor assess the base. Review stability, cracks, movement, flatness and water drainage against the requirements of the selected surface. Tiles do not replace necessary base repairs or a drainage design.
Confirm the supply schedule
Check the tile model, color quantities, edge pieces, corners, marking plan and spare components. Include equipment openings and access covers in the drawing. Confirm how the material will be packaged, unloaded and stored before installation.
Keep the approved sample, specification and final layout with the purchase record so the delivered material can be checked against them.
Prepare the base and materials
- Complete agreed base works and inspect them before covering the area.
- Remove debris and follow the selected system’s requirements for base condition and preparation.
- Inspect the delivered tiles, connectors and accessories for damage or differences from the order.
- Review the manufacturer’s guidance on installation conditions, tile orientation, starting position and perimeter movement.
- Agree the tools, cutting methods and handling procedures before work starts.
Do not copy an expansion gap or base tolerance from an unrelated tile system. These details belong to the selected product and the project’s conditions.
Lay out the court before cutting
Check the layout against actual site dimensions before connecting the full area. Confirm the position of the hoop or other equipment, line markings, drains and edge transitions.
Follow the specified connector direction and assembly method. Use only product-compatible cutting and marking methods. Keep drainage paths and access points clear, and coordinate any equipment fixings with the responsible contractor.
Inspect the completed installation
Before opening the court, review the assembled surface with the installer and operator. Check connections, perimeter treatment, edge pieces, transitions and marking alignment. Address damaged pieces, raised edges or other issues before handover.
Retain the final layout, product references, installation instructions and care documents. Record spare components so future replacements can be matched.
Establish a care routine
Inspect the court regularly for debris, damaged components and changes around the edges or base. Use the manufacturer’s approved cleaning methods and products. Do not assume that aggressive chemicals or high-pressure equipment are appropriate for every tile.
For an outdoor court, include drainage routes and the surrounding area in the maintenance routine. The operator should assess conditions before play and after weather events.
Questions to resolve with the installer
- Has the base been accepted against the selected system’s requirements?
- Is the layout coordinated with equipment, drains and access routes?
- Are product-specific movement clearances and edge details documented?
- Which cleaning methods, inspection tasks and replacement procedures apply?
- Who is responsible for supply, site works, installation and handover?
Send your court dimensions and installation requirements or explore court tile products.